Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
New branch of Central Asia-China gas pipeline starts operation - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

New branch of Central Asia-China gas pipeline starts operation

13
13

DUSHANBE, June 16, 2014, Asia-Plus — A ceremony was held in northwest China to mark the launch of Line C of the Central Asia-China natural gas pipeline, Radio Liberty reported on June 15.

Zhang Peng, an official from the China National Petroleum Corp said at the June 15 ceremony at the Khorgos border crossing that line C would already be carrying some 14 billion cubic meters (bcm) of gas to China by this October.

Line C runs from Turkmenistan, the source of the gas, through Uzbekistan and Kazakhstan to China”s western Xinjiang Uyghur Autonomous Region (XUAR) and will eventually carry some 25 bcm.

Lines A and B, which started in 2009 and 2010, respectively, run parallel to line C.

Construction of line D is expected to start later this year. 

When all four lines are operational and running at full capacity they will supply China with more than 40 of China”s gas imports.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS