Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Kazakhstan President, Chinese chairman took part in ceremony of commissioning of first line of gas pipeline Kazakhstan - China - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Kazakhstan President, Chinese chairman took part in ceremony of commissioning of first line of gas pipeline Kazakhstan – China

6
6

The President of Kazakhstan, Nursultan Nazarbayev, and the chairman of the Chinese National Republic, Hu Jintao, took part in the ceremony of commissioning of the first line of the gas pipeline Kazakhstan – China, the agency reports.

The goal of the project – maintenance of transit of natural gas of Turkmenistan through the territory of Kazakhstan to China and transportation of natural gas from oil and gas deposits of the Western Kazakhstan for export to China and Kazakhstan regions: Kyzylorda, South Kazakhstan, Zhambyl, Almaty areas and Almaty. It is one of the largest international projects in Kazakhstan, being implemented by Open Company Asian Gas Pipeline. Kazakhstan JSC Company KazStroiServise and Chinese СPP-Kazakhstan are contractors of the project.

The gas pipeline route begins at the border of Uzbekistan and Kazakhstan and passes through the territory of the South Kazakhstan, Zhambyl and Almaty areas to the border with China in Horgos point.

Total extent of the main line is 1304.5 kilometers. The gas pipeline consists of two parallel lines. Construction of the gas pipeline began in July, 2008. The capacity of the first line of the gas pipeline at the moment of its commissioning will be 4.5 billion cubic meters annual with its further growth.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS