Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Emergency situation emerges at Pamir-1 HPP as huge boulders can break away from nearby rock - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Emergency situation emerges at Pamir-1 HPP as huge boulders can break away from nearby rock

9
9

KHOROG, April 22, 2010, Asia-Plus  — An emergency situation has emerged at the Pamir-1 HPP in GBAO’s Shugnan district.

According to press service of the Pamir Energy Company (PamirEnergy), which operates the station, a huge crack has appeared in the nearby rock and heavy rainfalls on April 11-18 may cause a landslide.  A huge mass of boulders some 480 cubic meters in size can break away from the rock and hit the building placing the units, compressor station and the main transformer of the plant.

“By GBAO governor’s order specialists from the regional agency for emergency situation and the Main Geology Directorate under the Government of Tajikistan monitored the situation and came to a conclusion that the rock will not break away in the near future,” the source said.

However, to prevent the possible disaster specialists from these bodies jointly specialists from the energy facility constructing company Pomir are taking measure to ensure safe demolition of the rock, he added.

All the works are planned to be finished during a week.  Twenty-four hour service has been organized at the site.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS