Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Turkmenistan gets ready for official launch of gas pipeline to China - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Turkmenistan gets ready for official launch of gas pipeline to China

8
8

The construction of industrial facilities at Samandepe field, from which the Turkmenistan-Uzbekistan-Kazakhstan-China gas pipeline originates, is entering the home stretch. This was reported by the State News Agency of Turkmenistan (TDH) in connection with a working visit of President Gurbanguly Berdimuhamedov to Lebap province on 10 November.

A large-scale work on construction of facilities at Samandepe field and preparation of operating wells has been carried out in the contractual territory Bagtyyar. A major overhaul of the big group of old wells has been completed, and several new wells have been drilled.

Chinese experts have built the Samandepe gas processing plant with the projected capacity of processing of up to 5 billion cubic meters of sulfur dioxide and other gas, producing 170 tons of hydrocarbon condensate and 210 tons of pure sulfur gas per year. It is reported that the bulk of work has been carried out at this construction site. The powerful industrial infrastructure has been built there to pump natural gas to the plant.

As of today, there has been built a ground part of the Turkmen section of the Malay-Bagtyyarlyk pipeline, gas gathering points, compressor stations, gas-measuring installation of external engineering and communication networks.

According to official reports, Gurbanguly Berdimuhamedov viewed these sites and instructed relevant officials to take all steps to ensure the official commissioning of Samandepe field and gas processing plant in December this year.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS