Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Ukrainian "Altcom" to start construction of bridge across Amu Darya in Turkmenistan - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Ukrainian “Altcom” to start construction of bridge across Amu Darya in Turkmenistan

10
10

The financial-industrial group “Altcom” (Donetsk, Ukraine) will begin construction of a road bridge, Atamurat-Kerkichi, across the Amu Darya river in Turkmenistan before April of this year. This was reported by the company”s deputy general director Mikhail Kovalev in an interview with the internet portal “Trans-Port.”

According to Kovalev, “a camp for the company”s builders is currently being erected on the bank of the Amu Darya river, the design of the bridge has been completed, and actual construction will begin any day.” “We will start for sure in the first quarter,” he said. At the same time, the deputy general director of the company noted that the commissioning of the bridge will not be delayed and is scheduled for October 2012 as planned.

Kovalev also said that the cost of the project is US $ 159 million. The total length of the road bridge with coastal fortifications will be 1415 meters, and the width – 11.5 meters.

It should be recalled that according to the decree of Turkmen President Gurbanguly Berdimuhamedov of 17 September 2009, Turkmenavtoyollary State Concern (Turkmen roads) entered into a contract with “Altcom”, who won an international tender for the construction of the bridge.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS