Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Uzbekistan plans to attract World Bank loan for US$88m - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Uzbekistan plans to attract World Bank loan for US$88m

6
6

Uzbekistan is developing a project on improving water supply in Syrdarya region with the cost of US$100 million.

The Government has requested the World Bank assistance of US$88 million to “improve the level of service in terms of safety, quality, reliability, efficiency, financial viability, and sustainability of the water supply services in the six districts of Akaltyn, Bayaut, Kvasast, Mekhnatobad, Mirzaobad, and Sardoba in the Syrdarja region” with a total population of 340,000.

The project objective is to improve the coverage, quality, efficiency, and sustainability of public water supply services in selected districts of the Syrdarya region. The objective would be achieved through rehabilitation and/or replacement of the existing water supply infrastructure that has now reached the end of its useful life.

Uzkommunhizmat Agency (Uzbek Communal Service) will act as implementing the project. It is expected that the World Bank will allocate US$88 million loan through International Development Association (IDA) resources.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS