Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
A series of avalanches block in several places the road connecting Khorog and Ishkashim - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

A series of avalanches block in several places the road connecting Khorog and Ishkashim

19
19

A series of avalanches have blocked in several places the road connecting Khorog, the capital of the Gorno Badakhshan Autonomous Region (GBAO), and Ishkashim district, according to the Committee on Emergency Situations and Civil Defense (CoES) under the Government of Tajikistan.  

“The work on clearing the road of snow is under way, but heavy snowfall makes the work of road builders and rescuers difficult,” Ms. Umeda Yusufi, a spokeswoman for the CoES, told Asia-Plus in an interview.

ИЗОБРАЖЕНИЕ

According her, even specialists find it difficult to say when the Khorog-Ishkashim road will be open for traffic.   

While most roads are open for traffic, people throughout Tajikistan are being advised not to travel to mountain areas unnecessarily as the risk of further avalanches and rockfalls remains until January 20.  

ИЗОБРАЖЕНИЕ

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS