Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Construction of avalanche galleries expected to start at the end of this year or at the beginning of the next year - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Construction of avalanche galleries expected to start at the end of this year or at the beginning of the next year

7
7

In a report released at a news conference in Dushanbe, the First Deputy Minister of Transport, Suhrob Mirzoyev, noted on July 18 that construction of avalanche galleries along the mountain roads in Tajikistan will begin at end of this year or at the beginning of the next year.

According to him, the main problem is lack of finance.

“An agreement has been reached with Pakistan and Pakistan is expected to allot 5 million USD in non-strings said to Tajikistan for construction of the avalanche galleries.  Preparation of feasibility study for construction of 55 avalanche galleries with a total length of 5,665 meters is nearing completion and construction of the avalanche galleries will begin at end of this year or at the beginning of the next year,” Mirzoyev noted.  

An avalanche gallery, snow shed or snow bridge is a type of rigid snow-supporting structure for avalanche control (avalanche defense) or to maintain passage in areas where snow removal becomes almost impossible. They can be made of steel, prestressed concrete frames, or timber.  These structures can be fully enclosed, like an artificial tunnel, or consist of lattice-like elements.  They are typically of robust construction considering the environments they must survive in.

Recall, the Ministry of Transport presented a number of projects for construction of avalanche defense works on the most hazardous sections of mountain roads on September 27 last year at a meeting of the National Platform for Disaster Risk Reduction.  

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS