Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Heavy snowfall results in power supply disrupting in Tavildara - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Heavy snowfall results in power supply disrupting in Tavildara

7
7

TAVILDARA, January 9, 2009, Asia-Plus  — Tavildara district in the Rasht Valley was cut off from January 2 to January 7 as heavy snowfalls hit the district on the night of January 2-3.

Storms that dumped up to 50 centimeters of snow in Tavildara destroyed power transmission lines, disrupting electricity supply.

The district residents did not have electricity and heat for five days.  Local hospitals and boarding-school used generators.  Specialists managed to repair the line only on January 7.

Speaking in an interview with Asia-Plus, Ahliddin Karimov, an official with the Tavildara administration, said that five small power plants operating in the district generated totaling 136 kWh of electrical power and supplied electricity to the villages of Karanak, Chashmai kaboud, Muridon and Shohkakhak.  “This year, we intend to construct power transmission lines to another 18 villages,” Karimov said.  

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS