Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Kazakhstan completes China gas link segment - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Kazakhstan completes China gas link segment

8
8

China moved a step closer to securing a new source of gas supply on Friday when Kazakhstan finished building its segment of a pan-Central Asian gas pipeline designed to address China”s growing energy needs.

The pipeline is the first significant gas link connecting the former Soviet region with eastern markets while bypassing Russia. Russian gas monopoly Gazprom is currently the main buyer of Central Asian gas.

“The first gas will be shipped in late November 2009,” said Beimbet Shayakhmetov, the head of Asian Gas Pipeline company, a joint venture set up by China and Kazakhstan to build the link.

“In 2010, we will transit about 4.5-5.0 billion cubic metres of gas from Turkmenistan,” he told reporters as workers were welding the last pipe links at the construction site on the steppe near the country”s commercial hub of Almaty.

The Kazakh segment is part of a route that links Turkmenistan”s natural gas deposits with China via Uzbekistan and Kazakhstan. Other parts of the pipeline are yet to be completed.

Wang Dongjin, vice-president of Chinese state energy firm CNPC, said his company would fill the pipeline with gas from Amu Darya Right Bank area in Turkmenistan, where it operates under a production sharing agreement.

“At the moment … another field, South Iolotan, is being developed,” he told Reuters. “We will also ship gas from that field.”

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS