International terminal at DIA will be provided with a 500 kW diesel generator

DUSHANBE, May 12, 2014, Asia-Plus – A 500 kW diesel generator, manufactured by Russia’s PSM Ltd (Industrial Power Units) on the basis Volvo Penta, has been delivered to Dushanbe for international terminal that is being constructed at Dushanbe International Airport (DIA).   Established in 2005, PSM Ltd. (Industrial Power Units) is Russia’s leading gensets manufacturer.   The […]

Asia-Plus

DUSHANBE, May 12, 2014, Asia-Plus – A 500 kW diesel generator, manufactured by Russia’s PSM Ltd (Industrial Power Units) on the basis Volvo Penta, has been delivered to Dushanbe for international terminal that is being constructed at Dushanbe International Airport (DIA).  

Established in 2005, PSM Ltd. (Industrial Power Units) is Russia’s leading gensets manufacturer.   The company specializes in engineering, manufacturing and service of special equipment based on diesel engines.

Power generation division is a part of PSM Ltd, which designs and produces prime and standby power sources, as well as offers integrated solutions for autonomous power supply for all types of industrial, residential and administrative buildings.  130 models of diesel generator sets within 12 – 2000 kW power range in various versions are reportedly designed on domestic and imported diesel engines.

We will recall that an official ceremony of laying the foundation stone of the international terminal at the Dushanbe airport took place on March 19, 2013.  French company, VINCI, is the general contractor for construction of the terminal.

According to information posted on VINCI’s website, VINCI Construction Grands Projets and VINCI Airports (VINCI Concessions) signed the €39m design-build contract for a new terminal at Dushanbe International Airport with the DIA (Dushanbe International Airport) company on April 27, 2012.  Responding to a need for increased capacity at the airport, the new terminal will be able to handle 1.5 million passengers a year.  It will provide top-quality services to passengers and airlines, in line with international standards.  VINCI Construction Grands Projets is charged with the design and construction of the building, as well as supplying the operating equipment and systems.  VINCI Airports, for its part, will be assisting the client with the functional definition of the terminal (organization of flows, operational equipment and systems specifications), assisting the airport teams during the planning and works stages, training staff and assisting with the commissioning of the terminal.

The overall space of the international terminal at the Dushanbe airport is expected to be 11,000 square meters and it will able to receive more than 5,000 passengers per hour.  Specialists say the project will bring the Dushanbe airport up to international air traffic standards.

Article translations:

Related Articles

Оби зулол

Most Read

Join us on social media!

Recent Articles

#AP30/Experts. Rashid Ghani Abdullo: “Asia-Plus” has become a brand of Tajikistan

A well-known Tajik political scientist expressed his opinion on the role of our media in the informational space of the country and the region.

How did Sadriddin Ayni live? We created a video reconstruction

Today marks the 148th anniversary of the great writer, scholar, and public figure of Tajikistan.

Trump announces possible resumption of U.S.-Iran talks

Pakistan is once again actively working on their organization.

Six international organizations have urged Tokayev to stop the persecution of journalists in Kazakhstan

According to human rights activists, the lack of decisive measures to protect the press may undermine the credibility of the "New Kazakhstan" development program.

Sherali Kabir Discussed the Creation of Tajikistan’s AI Ecosystem with the Management of Goldman Sachs

One of the world's largest investment banks may participate in the implementation of strategic AI projects in the republic.