Small HPP introduced into operation in Kuhistoni Mastchoh

DUSHANBE, June 18, 2012, Asia-Plus  — A small hydroelectric power plant has been introduced into operation in the Kuhistoni Mastchoh district, Sughd province. Nozirjon Yodgori, a spokesman for Barqi Tojik (the state-owned utility responsible for generation, transmission, and distribution of electricity in Tajikistan), says an official ceremony of introducing the 500 kW Kuhiston HPP into […]

Avaz Yuldoshev

DUSHANBE, June 18, 2012, Asia-Plus  — A small hydroelectric power plant has been introduced into operation in the Kuhistoni Mastchoh district, Sughd province.

Nozirjon Yodgori, a spokesman for Barqi Tojik (the state-owned utility responsible for generation, transmission, and distribution of electricity in Tajikistan), says an official ceremony of introducing the 500 kW Kuhiston HPP into operation took place on June 17.

According to him, the plant was built in the framework of the national program for construction of small hydropower plants in mountain areas.  “Barqi Tojik has spent some 5.9 million somoni for construction of this plant,” Yodgori added.   

Article translations:

Related Articles

Оби зулол

Most Read

Join us on social media!

Recent Articles

Tax Burden in Tajikistan: What Lies Behind the Numbers?

The highest tax burden in Central Asia is in Tajikistan, while the lowest is in Uzbekistan.

Maroon Beret as a Symbol of Courage: Tajikistan Conducts Elite Special Forces Trials for the First Time

150 fighters competed for the right to wear the maroon beret, which is associated worldwide with elite special forces.

Military Recrutiment Officer in Sughd to Stand Trial for Bribery

He received money for granting a deferment from service to one of the conscripts.