Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Kyrgyzstan to raise electricity tariff for residential customers by 30 percent - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Kyrgyzstan to raise electricity tariff for residential customers by 30 percent

28
28

Electricity rate for residential customers will rise 30 percent beginning on May 1, 2023 – from 0.077 som (equivalent to US$0.0089) to 1.00 som (equivalent to US$0.012).  

“If we don’t do that, we risk losing our energy industry forever.  Because expenses on payment of energy employees’ salaries, replaces of obsolete transformers and power transmission lines are added to the cost of the generated electric power, and a s a result, the cost for one kWh of electricity increases to 2.38 soms,” Kyrgyz President Sadyr Japarov wrote on his Facebook page.   

According to him, not a single hydroelectric power plant has been built during the years of independence and high power transformers and high voltage lines have not been updated.   “Wear of electrical equipment has been more than 80 percent,” said Japarov.   “Meanwhile, the population has increased by half and the country’s annual requirements in electricity have increased from 9 billion kWh in 1991 to about 16 billion kWh.”  

“Meanwhile, the debt of the country’s energy sector amounts to 137 billion soms (equivalent to 1.6 billion U.S. dollars).  Roughly speaking, the domestic energy industry has become half-alive,” Kyrgyz president stressed.  

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS