Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Nearly 4 mln somoni needed for reconstruction of houses damaged in Rasht, says CES chief - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Nearly 4 mln somoni needed for reconstruction of houses damaged in Rasht, says CES chief

15
15

DUSHANBE, October 19, 2010, Asia-Plus  – Nearly 4 million somoni (equivalent to more than 900,000 U.S. dollars) are needed for reconstruction of residential buildings in Kamarob Gorge, Rasht district that were destroyed and seriously damaged during a special operation to hunt down illegal armed gangs in the area, Khaybullo Latipov, the head of the Committee for Emergency Situations and Civil Defense (CES), remarked at a news conference in Dushanbe today.

According to him, the district commission inspected the damaged houses in Kamarob Gorge and estimated damage caused to the houses at nearly 4 million somoni.

“We have already sent 120 tons building materials to Rasht and I think the houses will be reconstructed before cold weather comes,” Latipov said.

We will recall that the CES source told Asia-Plus on October 7 that three houses were destroyed completely and several others were partially damaged.  Besides, several barns were destroyed.

The October 4 RFE/RL item titled “Worries Grow As Tajik Government Continues Operation Against Militants” reports that woman from the village of Kochon, near Kamarob, told Radio Liberty that “three or four houses and a few barns were burned” in the latest clashes.  “Everyone had run away to hide when [the military operation] took place, so there was no one to put out the fire,” she added.  Officials in Dushanbe have promised that the owners of destroyed properties will receive compensation from state.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS