Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

New settlements in Kulob connected to the regional power supply network

KULOB, August 29, 2011, Asia-Plus  — Six new settlements built in Kulob for victims of last year’s floods have been connected to a transformer substation, built by Barqi Tojik (the state-owned utility responsible for generation, transmission, and distribution of electricity in Tajikistan) especially for them.

The Kulob municipal power supply network head Jumakhon Sharipov says the transformer’s capacity is 16,000 kVA (kilovolt-ampere) and the new substation will allow “partially discharging the neighboring “Kulob” substation during autumn-winter period.”

In the meantime, the Kulob regional power supply network head Mirzo Ismoilov told Asia-Plus today that a 5.2-kilometer power transmission line will be introduced into operation in the village of Sulduzi, Baljuvon district on September 9.  

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS