Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Kazakhstan to be biggest uranium miner in 2009 - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Kazakhstan to be biggest uranium miner in 2009

19
19




DUSHANBE



, July 23, 2008, Asia-Plus –

Kazakhstan

, the world”s third- biggest uranium miner, plans to overtake

Canada

and


Australia


next year by producing 12,826 metric tons of the radioactive metal.




The country is aiming to become the world”s biggest producer of uranium, said Mukhtar Dzhakishev, the president of state- run Kazatomprom, on July 22. The company plans to produce more than 9,000 tons of uranium this year, he said.





Kazakhstan




is seeking to use its uranium reserves, which account for 15 percent of the world”s total, to participate in all stages of the production cycle, from mining to power generation. Kazatomprom paid about US $4.16 billion in October to purchase a 10 percent stake in Westinghouse Electric Co. from Toshiba Corp, reported Bloomberg.


Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS