Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Kazakhstan mobilized $19 billion for economic stabilization program - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Kazakhstan mobilized $19 billion for economic stabilization program

7
7

The President of the Republic of Kazakhstan, Nursultan Nazarbayev, during the regional investment forum in Ust Kamenogorsk said Kazakhstan has managed to mobilize $19 billion for economic stabilization program, the agency reports citing the president”s press service.

“We have managed in difficult conditions to mobilize more than $19 billion for economic stabilization program and this is 14 % of GDP. Owing to this, the economy in II quarter of 2009 received a powerful impulse towards restoration,” N. Nazarbayev said.

“I stated the main directions of post crisis development of Kazakhstan at XII congress of Nur Otan. We have defined for ourselves the priority directions of development of the national economy: agricultural and industrial complex, construction industry, metallurgy, oil refining and services, chemistry and pharmaceutics, infrastructure and power,” the head of the state noted.

“These branches possess competitive potential.”We set a specific goal – to satisfy the internal demand and to export production of these branches. Realizing this program, we will create the new economy, new manufactures, highly paid jobs, and will provide steady development,” the President considers.

According to the head of the state, 100 % of 261 billion KZT allocated in 2007 – 2009 has been spent for support of small and medium business. 8037 projects have been financed. 191 billion KZT has been allocated for all regions of Kazakhstan for realization of ”Road Map” project this year.

According to N. Nazarbayev, the work on increase of Kazakhstan”s share in state purchases has begun. As of today, the national companies, subsoil users, and large enterprises have already conclude 6462 contracts for the sum of more than 537.9 billion KZT.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS