Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Water starts flowing into manmade Turkmen lake in Karakum desert - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Water starts flowing into manmade Turkmen lake in Karakum desert

5
5

The construction of the first phase of a unique hydraulic facility – Turkmen lake “Altyn Asyr” finished in the middle of the Karakum desert. Turkmen builders completed the construction of trenches – two manmade rivers running for over thousands of kilometers.

Drainage water collected from the fields in Dashoguz, Lebap, Mary and Akhal provinces, flowing along the beds of these rivers, merge at the so-called collector, from which water flows to the Turkmen lake.

Every year, up to 10 billion cubic meters of mineralized drainage water will flow to the Turkmen Lake which sits in the natural depression called Karashor in the Karakum desert. The lake will dramatically improve ameliorative condition of irrigated lands and would solve many problems related to salinity, waterlogging of land and drought. The total capacity of the reservoir is 132 billion cubic meters with the surface area occupying about two thousand square kilometers.

The implementation of this multi-billion project will open qualitatively new opportunities and horizons for the development of the country”s agricultural sector and will contribute to the conservation, rational use of water resources, and improvement of environment both in Turkmenistan and Central Asia.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS