Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Prime minister visits Hamadoni to study progress of construction of riverbank protection works - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Prime minister visits Hamadoni to study progress of construction of riverbank protection works

23
23




DUSHANBE


, March 6, Asia-Plus – On Saturday March 4, a government delegation led by Prime Minister Oqil Oqilov visited the Hamadoni district to study a progress of the construction of the riverbank protection works, presidential press service reported.

Oqilov demanded at a meeting that was held on the site that the work on reinforcement of banks of the


Panj


River


and the canal Dehqonobod in Hamadoni should have been finished by April 10.       

According to the source, at present 1,400 workers from 24 construction sub-units of the Ministry of Emergency Situations, Ministry of Land Reclamations and Water Recourses, and other relevant organizations are working on reinforcement of banks of the river and the canal.  75 bulldozers, 35 excavators and other special machines have been involved in the construction of the riverbank protection works in the district.  

We will recall that the government provided 30 million Somonis and to date, 10 million Somonis have already been spent.  

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS