Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
ADB provides $22 million to support flood risk management system for Khatlon - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

ADB provides $22 million to support flood risk management system for Khatlon

15
15

DUSHANBE, November 5, Asia-Plus  — A loan agreement to support the Khatlon Province Flood Risk Management Project was signed between the Tajik government and the Asian Development Bank (ADB) in Dushanbe on November 3.    

A total cost of the project is $27.7 million.  ADB provides a $22 million loan and the balance will be covered by the Tajik government.   

 Tajikistan is prone to frequent natural disasters because of its terrain and climate. Floods are particularly severe disaster risks because of the mountainous nature of the country.  

 Khatlon Province Flood Risk Management Project will address recurring flood risks in four districts in the province – Vose, Farkhor, Kulob and Hamadoni — through a comprehensive and coordinated approach.  A major part of the project is the rehabilitation of 8.3 kilometers of flood protection embankment along Panj River, which borders Tajikistan and neighboring Afghanistan.  Assuming that a medium level of maintenance is achieved, the proposed embankment can protect against floods at the probability of once in 100 years.

The project will also develop and disseminate a flood risk map, strengthen flood warning systems, draw up a flood preparedness and evacuation plan, and strengthen flood forecasting capacity by rehabilitating the country’s hydrometeorological network.  The project will also help the government define and implement policy reforms needed to improve flood preparedness and remove some of its persistent operation and maintenance funding constraints for flood levees and riverbank protection works.

The project is designed for five years (2008-2013).  The ADB loan carries a 32-year term, including a grace period of eight years, and an interest rate of 1% per annum during the grace period and 1.5% per annum after.  

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS