Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Disaster affected victims from Kulob are removed to their future residences - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Disaster affected victims from Kulob are removed to their future residences

3
3

KULOB. 24 May. Asia-Plus — Victims from Kulob affected by the disaster on May 7 are now being removed from the emergency camp to places of their future residence. 

Heavy rainfalls which continued during the last week have slowed this process, Kulob Mayor Hamid Abdulloev told the AP.

“This night’s heavy rainfall which was accompanied by hail forced us to remove people from emergency camp to educational institutions and their relatives,” he said.

According to him, starting from today every victim will place tent at the place of their future residence and will help constructors to build their houses and will get salary.

“Nearly 60% of construction sites of 600 future houses in the outskirts of Kulob are now provided with sand, crushed stones, bricks and cement and foundation of many future houses is already laid,” he noted adding that the process of resettlement of disaster affected victims from 636 emergency tents will be completed within the next 3 days.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS