Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Emirati company to build wind farm in Uzbekistan’s Navoi region - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Emirati company to build wind farm in Uzbekistan’s Navoi region

21
21

Uzbek media reports say Emirati company Masdar, also known as the Abu Dhabi Future Energy Company PJSC, will build wind farms in Uzbekistan with a total capacity of 400 MW.

An agreement on this subject was signed between the Government Uzbekistan and Mubadala Development Company (UAE) and its subsidiary Masdar, according to Podrobno.uz.  

The wind farms will be built in the Navoi region and will be introduced into operation in 2022.  The cost of the project is reportedly 600 million U.S. dollars. 

In 2019, Masdar won a tender on attraction of investments in Uzbekistan’s alternative energy sector on the basis of the public-private partnership (PPP).  The same year, an agreement on construction of a 100 MW photovoltaic power plant in the Navoi region was signed.  

Masdar, also known as the Abu Dhabi Future Energy Company, is a renewable energy company based in Abu Dhabi, United Arab Emirates. Masdar has three business units including Masdar Clean Energy, Masdar City, and Masdar Capital.  Masdar's mission is complemented by the Masdar Institute, an independent research university. Masdar is a subsidiary of the Mubadala Development Company and was founded in 2006.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS