Tajikistan marks 70th anniversary of its energy sector

DUSHANBE, December 22, Asia-Plus – A ceremonial meeting on the occasion of the 70th anniversary of the establishment of Tajikistan’s energy sector opened in Dushanbe today morning Prime Minister Oqil Oqilov addressed the meeting to congratulate Tajik power engineering workers on their professional holiday.    “Tajik power engineering was founded in 1936, when the Varzob-1 hydropower […]

Zarrina Ergasheva

DUSHANBE, December 22, Asia-Plus – A ceremonial meeting on the occasion of the 70th anniversary of the establishment of Tajikistan’s energy sector opened in Dushanbe today morning

Prime Minister Oqil Oqilov addressed the meeting to congratulate Tajik power engineering workers on their professional holiday.   

“Tajik power engineering was founded in 1936, when the Varzob-1 hydropower plant was constructed; it has the capacity of only 3.5 MW was constructed,” said a source at Barqi Tojik power holding, “Thus, Central Asia’s largest Norak hydroelectric power station constructed on the Vakhsh River in the Seventies has the capacity of 3,000 MW.”  

Tajikistan tops the Central Asian region in terms of reserves of water and power resources and is second place among CIS states and eight place globally.  Tajikistan’s reserves of water and power resources amount to 527 billion kWh per annum.   At present the country is using only 3.4 percent of these reserves. 

A total capacity of power plants operating in Tajikistan is 4,412.7 MW.  98 percent of Tajik electricity is generated by the hydroelectric power stations (HPS).  

According to the source, the largest amount of electrical power was generated by Tajikistan in 1996 – 18 billion kWh.   At present an annual generation of electricity in Tajikistan amounts to 15 billion kWh.    

Tajikistan’s largest HPS is the Norak power plant having the capacity of 3,000 MW.  The Baipaza plan has the capacity of 600 MW, Golovanaya 240 MW, and Qairoqqum plant 126 MW.  

A total capacity of small hydropower plants operating in Tajikistan amounts to nearly 30 MW, the Barqi Tojik source noted.   

At present Tajikistan is implementing projects to build Sangtuda-1, Sangtuda-2 and Roghun power plants on the Vakhsh River.  When built these power plants will bring a total annual generation of electricity in the republic to 31billion-35 billion kWh.

Article translations:

Related Article

Оби зулол

Most Read

Join us on social media!

Aura

Recent Articles

Sanctions lifted: Dushanbe City Bank resumes international operations

The bank is returning to full-scale international operations.

Gasoline and diesel fuel in Dushanbe rose in price by 8.9% due to the war in the Middle East

The rise in global oil prices and, consequently, the cost of petroleum products has triggered the closure of the Strait of Hormuz.

The Ministry of Labor organizes consultations for migrants returning from Russia at Dushanbe airport

Employees of the Migration Service explain the requirements of Russian legislation and offer job vacancies in their homeland.

Tajikistan and Uzbekistan discuss simplification of customs procedures and implementation of VIN.TJ system

The VIN.TJ system is designed to simplify the process of vehicle registration and control.

Tajikistan climbs four places in the global fixed internet speed ranking

This is the country's best performance in the past five years.

President of Tajikistan launches hydro unit No. 7 at Nurek HPP

As of today, three units have been completely replaced at the country's largest hydroelectric power station.

Italian Opera in Dushanbe: Shohrukh Yunusov invites to an evening of musical revelations

The evening will feature the most recognizable Italian works alongside world and Tajik classics.

The European Union lifts sanctions on Tajik banks

This is attributed to successful reforms and improved financial transparency in the country.

Meta announced plans to lay off about 10% of its staff

The reason cited is the high costs of artificial intelligence development.