Tajikistan ratifies supplement to MoU on construction of Sangtuda-2 power plant

DUSHANBE, January, Asia-Plus — Tajik parliament has ratified a supplement to a June 11, 2005 memorandum of understanding (MoU) between Iran and Tajikistan on the construction of the Sangtuda-2 hydropower plant in Tajikistan.   A regular sitting of the third session of the Majlisi Namoyandagon (Tajikistan’s lower chamber of parliament) of the third convocation, presided over […]

Zarrina Ergasheva

DUSHANBE, January, Asia-Plus — Tajik parliament has ratified a supplement to a June 11, 2005 memorandum of understanding (MoU) between Iran and Tajikistan on the construction of the Sangtuda-2 hydropower plant in Tajikistan.  

A regular sitting of the third session of the Majlisi Namoyandagon (Tajikistan’s lower chamber of parliament) of the third convocation, presided over by its chairman, Saydullo Khairulloyev, was held on January 10.

Asomuddin Saidov, head of the Majlisi Namoyandagon Committee on International Affairs, Public Associations and Information, said in an interview with Asia-Plus that the supplement concerns Tajikistan’s government guarantees to the Iranian side. 

Saidov said that under the agreement between Tajikistan and Iran to construct the Sangtuda-2 power plant in Tajikistan, signed by energy ministers of the two countries in Tehran on June 11, 2005, Iran will contribute $180 million and Tajikistan $40 million.  The work on the project is slated to take four year.  The Iranian side wanted government guarantees from Tajikistan, Tajik MP said.     

According to Saidov, the MoU was drawn up in 19 articles and an addenda was also made to the article under which, once the power plant is built, all the revenue over the next 12.5 years will go to the investor, and Tajikistan will become the owner of Sangtuda-2 after this period expires.  

“Besides, the Iranian side is exempted from paying all types of taxes during the period of the construction of the plant and the tax on sale of electricity after the plant is put into operation,” the parliamentarian said.  

Saidov added that during 12.5 years, when the all revenue go to the investor, electricity generated by the Sangtuda-2 plant will be supplied to Tajikistan at world prices, 2.98 cents for each kWh.  According to him, an agreement on purchase/sale of electricity generated by the Sangtuda-2 station has been signed by Iran’s Tarh-e Sangtuda-2 and Tajik power holding Barqi Tojik (Tajik electric systems).   “Although the agreement has been signed the rate may possibly be reviewed,” Tajik MP noted.  

The construction of the Sangtuda-2 hydroelectric power station on the Vakhsh River in southern Tajikistan officially commenced on February 20, 2006.  The station will be finished in 2010.  Chief contractor of the project is Iran’s Sangab.

Article translations:

Related Article

Оби зулол

Most Read

Join us on social media!

Aura

Recent Articles

Sanctions lifted: Dushanbe City Bank resumes international operations

The bank is returning to full-scale international operations.

Gasoline and diesel fuel in Dushanbe rose in price by 8.9% due to the war in the Middle East

The rise in global oil prices and, consequently, the cost of petroleum products has triggered the closure of the Strait of Hormuz.

The Ministry of Labor organizes consultations for migrants returning from Russia at Dushanbe airport

Employees of the Migration Service explain the requirements of Russian legislation and offer job vacancies in their homeland.

Tajikistan and Uzbekistan discuss simplification of customs procedures and implementation of VIN.TJ system

The VIN.TJ system is designed to simplify the process of vehicle registration and control.

Tajikistan climbs four places in the global fixed internet speed ranking

This is the country's best performance in the past five years.

President of Tajikistan launches hydro unit No. 7 at Nurek HPP

As of today, three units have been completely replaced at the country's largest hydroelectric power station.

Italian Opera in Dushanbe: Shohrukh Yunusov invites to an evening of musical revelations

The evening will feature the most recognizable Italian works alongside world and Tajik classics.

The European Union lifts sanctions on Tajik banks

This is attributed to successful reforms and improved financial transparency in the country.

Meta announced plans to lay off about 10% of its staff

The reason cited is the high costs of artificial intelligence development.