PM gets acquainted with construction of the Vahdat-Yovon railway

DUSHANBE, April 11, 2016, Asia-Plus – On Saturday April 9, Prime Minister Qohir Rasoulzoda got acquainted with the pace of the construction of the Vahdat-Yovon railway. We will recall that construction of tunnels and bridges along the Vahdat-Yovon railway started in early September this year.  Three tunnels with total length of more than 3.7 kilometers […]

Asia-Plus

DUSHANBE, April 11, 2016, Asia-Plus – On Saturday April 9, Prime Minister Qohir Rasoulzoda got acquainted with the pace of the construction of the Vahdat-Yovon railway.

We will recall that construction of tunnels and bridges along the Vahdat-Yovon railway started in early September this year.  Three tunnels with total length of more than 3.7 kilometers and five bridges with total length of 712 meters will be built along the Vahdat-Yovon railway.

The construction of a rail link connecting Dushanbe, Vahdat and Yovon is expected to be completed in September 2016.

The Vahdat-Yovon railway that is 46.3 kilometers in length is being built in two stages.  The first phase of the project includes construction of 13 kilometers of railway from the railway station Ilyak in the Vahdat district to the railway station Gambuloq in the Roudaki district.  The second phase includes construction of a 33.3-kilometer railway from the Gambuloq station to the railway station Yovon-2 that will connect the railways Dushanbe-Vahdat and Yovon-Qurghon Teppa.

The Export-Import Bank of China (China Exim Bank) has reportedly provided a $72 million loan for implementation of this project.

The present railway link joining the Tajik capital and Qurghon Teppa, which is 429 kilometers in length, runs across the territory of Uzbekistan and the Uzbek authorities have suspended rail traffic to the Tajik southern Khatlon province.

The Vahdat-Yovon railway will link the country”s central part with the southern province of Khatlon and will make it possible to shorten the distance by 152 kilometers.

While in Yovon, the prime minister also visited sites for construction of the plant for production of cryolite, the plant for production aluminum fluoride, and the plant for production of sulfuric acid.

These facilities are expected to be introduced into operation in the summer this year.   

Article translations:

Related Articles

Оби зулол

Most Read

Join us on social media!

Aura

Recent Articles

Tajikistan to be Represented by Ten Athletes at the 2026 Asian Beach Games

The games will take place from April 22 to 30 in the Chinese resort city of Sanya.

Protection of depositors’ interests is our concern, – Deposit and Savings Insurance Fund of Tajikistan

The main task of the Fund is to protect the interests of depositors and strengthen public confidence in the country's banking system.

Ambassador of China: China remains the main investor in Tajikistan

Interview with the Ambassador of China to Tajikistan, Mr. Guo Zhijun.

A23a is done: the legendary giant iceberg has almost disappeared, losing 99% of its area

The giant is "ending the story," rapidly disintegrating in open waters.

Budget Travel and Service Issues: How to Make Traveling in Tajikistan Affordable for Tajik Citizens?

The State Committee for Tourism explained why domestic tourism in Tajikistan is more than just an alternative to trips abroad.

Tajikistan’s potato imports from Kazakhstan increase 257 times

The surge is linked to the lifting of the temporary export ban to Kazakhstan.