Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Uzbekistan builds rail link to the Ferghana Valley that bypasses Tajikistan - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Uzbekistan builds rail link to the Ferghana Valley that bypasses Tajikistan

16
16

DUSHANBE, February 25, 2016, Asia-Plus – Uzbekistan has completed construction of a rail link to the Ferghana Valley that bypasses Tajikistan.

According to the Uzbekistan Railways (”Ozbekiston Temir Yollari”), the new 123-kilometer electrified railway runs from Angren in Tashkent region to Pap in Namangan region over the 2,200-meter Kamchik Pass along the northern border of Tajikistan.

The project reportedly included construction of a 19-kilometer tunnel, bridges with a total length of 2,100 meters and rehabilitation of three bridges with a total length of 151 meters.

A total cost of the project is 1.9 billion U.S. dollars.   

The project allows Tashkent to abandon use of a Soviet-era, 110-kilometer rail link that cuts across Tajikistan”s northern Sughd province, and, thus, acquire transport independence.

Uzbekistan had earlier used that international rail route for shipping oil and petroleum products for a reported annual transit fee of US$25 million.

Earlier, Uzbekistan reportedly built railway link to bypass territories of Kazakhstan and Turkmenistan.   

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS