Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6131
Fatal traffic accident reported in the Shahriston Tunnel - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Fatal traffic accident reported in the Shahriston Tunnel

15
15

DUSHANBE, November 5, 2012, Asia-Plus – A fatal traffic accident has been reported in the Shahriston Tunnel that links the northern part of Tajikistan within the center.

The Interior Ministry traffic police directorate says the accident took place in the tunnel on November 3.

“Opel-Astra, driven by Abduhofiz Abdurahimov, collided with Chinese-made Star belonging to Chinese construction company,” said the source.  “As a result of the collision, the Opel driver and his passenger sustained various wounds and were taken to the Shahriston central district hospital.  The passenger died in the hospital several hours later.”

The cause of the accident is under investigation.

We will recall that the Shahriston tunnel was introduced into operation on October 27.  The 5,252-meter Shahriston Tunnel is part the Dushanbe-Khujand-Chanak highway rehabilitation project.  The tunnel was constructed with help of specialists from China Road and Bridge Corporation (CRBC).  A total budget for construction of the Shahriston Tunnel is US$51.7 million.

The Dushanbe-Khujand-Chanak highway rehabilitation project was launched in summer 2006.  Chinese company, China Road and Bridge Corporation, won the tender and Beijing in 2006 offered Tajikistan grants and loans to fund the project.  A total project cost is estimated at $295.9 million, including $281.1 million provided by the Chinese government in a form of a long-term loan.  The loan carries a 20-year period and an interest rate of 2 percent per annum.  The remaining some $14.8 million have been provided by the Government of Tajikistan.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS