Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6131
Massive rockfall blocks Dushanbe-Khorog highway in Darvoz - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Massive rockfall blocks Dushanbe-Khorog highway in Darvoz

4
4

DUSHANBE, February 27, 2015, Asia-Plus — A massive rockfall has blocked the Dushanbe-Khorog highway in the Darvoz district of the Gorno Badakhshan Autonomous Region (GBAO).

The rockfall occurred on the 374th kilometer of the highway from Dushanbe to Khorog yesterday at around 3:00 pm, an official source at the Committee on Emergency Situations and Civil Defense (CES) told Asia-Plus in an interview. 

Approximately 200 vehicles reportedly stuck in both sides of the rockfall.  Fortunately no injured was reported, according to the source.

“Blast works are needed to clean the road but the threat of a big piece of rock crashing into the road still makes road-cleaning works and rescue operations impossible,” the source added.       

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS