Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Highways connecting Tajik capital with GBAO and Sughd province reopen but not for all - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Highways connecting Tajik capital with GBAO and Sughd province reopen but not for all

16
16

Highways connecting Dushanbe with the Gorno-Badakhshan Autonomous Region and Sughd Province have been cleared of snow and movement along them has been restored but not for all vehicles. 

“The Dushanbe-Khujand highway has been cleared of snow and reopened to the movement of cars.  The Dushanbe-Khorog highway has also been cleared of snow and reopened for traffic.  However, the risk of further avalanches remains high and our units on the ground are closely monitoring the situation,” Ms. Umeda Yusufi, a spokeswoman for the Emergencies Committee under the Government of Tajikistan, told Asia-Plus Thursday (February 25) afternoon.  

The Branch of Innovative Road Solutions (IRS) in Tajikistan, which operates the toll on the Dushanbe-Chanak highway, notes that the Dushanbe-Khujand highway was closed for traffic for 8-9 hours.

Eight large and small avalanches reportedly hit the highway section from the 67th kilometer to the 81st kilometer in Varzob district on February 23.  The largest avalanche was more than 10 meters in height and 80 meters in length.

“Snowfall continues on some sections of the highway and the risk of further avalanches in the area remains high,” Daler Merganov, a spokesman for IRS Tajik Branch, told Asia-Plus today afternoon.

According to him, special road machines are working in areas of possible avalanches.   

In this connection, the Emergencies Committee advises people throughout the country not to travel to mountain areas unnecessarily. 

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS