Situation at Pamir-1 power plant under control, says PamirEnergy official

DUSHANBE, February 7, Asia-Plus – PamirEnergy (Pamir Energy Company) wishes to assure its customers that it is doing everything under its control to get the plant operating at maximum levels, Mahedi Lalani, Head of Corporate Communications and Public Affairs Pamir Energy Company Sudden water flooding of the Pamir-I hydropower plant in the village of Tang, […]

Bahrom Mannonov

DUSHANBE, February 7, Asia-Plus – PamirEnergy (Pamir Energy Company) wishes to assure its customers that it is doing everything under its control to get the plant operating at maximum levels, Mahedi Lalani, Head of Corporate Communications and Public Affairs Pamir Energy Company

Sudden water flooding


of the Pamir-I hydropower plant in the village of Tang, Shugnan district, just outside of Khorog, GBAO, was reported Monday, at 5:35 p.m.

Lalani said that with the support of emergency services and the government agencies, the closure of the water gates to the power plant has been secured and flooding has effectively been brought under control.  Nobody was injured or harmed during this course of events, according to him. 

At this time, the cause of the flood, extent of damage and time to repair are unknown as inspection of the site remains difficult.  The government and PamirEnergy specialists will conduct a full investigation to determine causes and make recommendations on the rehabilitation of the facility. 

PamirEnergy is exploring, in partnership with other AKDN agencies, all the possibilities to mitigate the inconvenience caused to PamirEnergy consumers and the people of GBAO.

The PamirEnergy project involved the rehabilitation and expansion of the Pamir 1 power plant, a major (28 MW) hydro electric power project. Following its completion in November 2005, an all-day electricity supply was provided to the residents of Khorog city and surrounding districts for the first time since independence.

While Pamir-1 hydropower plant currently remains closed, provisions for power supply to PamirEnergy customers are made from the Khorog I (9 MW) power plant on a restricted basis, with a power sharing schedule to be agreed shortly with the Government.

“PamirEnergy appreciates your understanding and cooperation and wishes to assure its customers that it is doing everything under its control to get the plant operating at maximum levels,” Lalani said.  

PamirEnergy, which is 70% owned by the Aga Khan Fund for Economic Development (AKFED) and 30% by the World Bank’s private finance division, the International Finance Corporation (IFC), has a 25 year concession on the assets formerly under the management on Barqi Tojik (Tajik electric systems) in GBAO.  In exchange for this concession (management right), PamirEnergy invests in completing the Pamir hydropower station, rehabilitating power generation, transmission and distribution assets, and improving the management of the company.

Join us on social media!

Article translations:

Related Article

Оби зулол
Оби зулол
Tenisi

Most Read

Коммерсбонк Точикистон

Recent Articles

Major global investment companies show interest in Tajikistan’s economy

Among them are J.P. Morgan, Loomis Sayles & Company, Morgan Stanley Investment Management, and Global Evolution.

President Rahmon awarded UN University for Peace Certificate of Recognition

He is awarded for "significant contribution to establishing peace, developing regional cooperation, and strengthening mutual understanding between peoples."

Starlink satellite internet becomes available in Kyrgyzstan

And in Tajikistan, it was launched in February of this year.

In Dushanbe, 30 more new electric buses start operating

Each is designed to carry 100 passengers and can travel up to 300 kilometers without recharging.

Who is the man who “increased the Aryan race” and told the President of Tajikistan about it?

Kozie Koziyev, a folk craftsman, built dozens of houses, participated in the construction of a mosque and a kindergarten in Matcha, raised 11 children, and created a true dynasty of builders.

Tajik leader discusses water, climate, and global security issues with UN Deputy Secretaries-General

The parties paid special attention to the "Dushanbe Water Process," parliamentary diplomacy, and the peaceful resolution of conflicts.

Tajikistan completes the spring military draft target ahead of schedule

There is still a week left until the end of the conscription campaign.

Custodian of non-written languages and builder of academic bridges; philologist Khusrav Shambezoda turns 70

He could have devoted himself exclusively to the study of classical heritage, but he chose the challenging path of preserving the living word — and Tajik-Russian science gained in him a brilliant sociolinguist whose name became synonymous with dedication.

Tajikistan ranks among the top three leading trade reformers in Europe and Central Asia

The country has shown progress in the digitalization of trade procedures, the reduction of paper barriers, and the enhancement of transparency for exporters.

China to send workers to Tajikistan for modernization of the Kulma BCP

This is the only land border crossing point between Tajikistan and China.