World Bank reportedly plans to loan US$200 mln for CASA-1000 project

DUSHANBE, December 28, 2011, Asia-Plus  — The World Bank is currently considering the possibility of providing a preferential loan of 200 million U.S. dollars for implementation of the Central Asia South Asia Electricity Transmission and Trade Project (CASA-1000), the source in the Ministry of Energy and Industries says. According to him, the loan will be […]

Avaz Yuldoshev

DUSHANBE, December 28, 2011, Asia-Plus  — The World Bank is currently considering the possibility of providing a preferential loan of 200 million U.S. dollars for implementation of the Central Asia South Asia Electricity Transmission and Trade Project (CASA-1000), the source in the Ministry of Energy and Industries says.

According to him, the loan will be distributed among Tajikistan, Kyrgyzstan, Afghanistan and Pakistan.

“A total cost of the CASA-1000 electricity project is 953 million U.S. dollars, including incidental expenses as well as expenses on strengthening of domestic power transmission networks and the preliminary expenses of social and environmental nature,” the source added.

Each of the countries participating in the project is expected to allocate funds for financing of facilities located in its territory.

“Expenses are distributed among the countries as follows: Afghanistan – 309 million U.S. dollars; Kyrgyzstan – 196 million U.S. dollars; Pakistan – 197 U.S. dollars; and Tajikistan – 251 million U.S> dollars,” the source said.

Meanwhile CASPIONET reports Mr. Alex Kremer, the head of the World Bank office in Bishkek, stated at the Seminar on Kyrgyzstan’s Energy Development in Bishkek on December 22 that the World Bank plans to allocate 200 million US dollars to Kyrgyzstan within the framework of the CASA-1000 project.   According to him, Kyrgyzstan will be able to fully return the loan issued by the World Bank within 5 years of participation in this project. If Kyrgyzstan invests 200 million US dollars in the construction of power lines under the project, the country’s annual income will be from 40 to 55 million US dollars.

It was also noted that the World Bank plans loan of $250 million to Tajikistan, $350 million to Afghanistan and Pakistan $200 million as part of CASA-1000 project.

The Central Asia South Asia Electricity Transmission and Trade Project (CASA 1000) is dedicated to develop the necessary physical infrastructure and create the institutional and legal framework to transmit surplus power available from existing generation facilities in Tajikistan and Kyrgyzstan to Afghanistan and Pakistan.  The physical infrastructure for CASA 1000 is likely to include: a 500 kV High Voltage Direct Current (HVDC) transmission system between Tajikistan and Pakistan through Afghanistan; an AC transmission link from Kyrgyzstan and Tajikistan to connect to the HVDC line from Tajikistan to South Asia; and the necessary electricity sub-stations in Kabul, Peshawar and Sangtuda (in Tajikistan).

Article translations:

Related Articles

Оби зулол

Most Read

Join us on social media!

Recent Articles

Hajj 2026: New Rules and Restrictions Introduced in Saudi Arabia

Entry to Mecca is now only possible with a special permit.

Emomali Rahmon flies to Astana for the Regional Ecological Summit

President of Tajikistan Emomali Rahmon departed today for a...

Nexign and TelecomDaily: the telecommunications market in Tajikistan grew by 13.7% in 2025

A study showed that the country's communications market has grown to 4.9 billion somoni, and the dynamics are influenced by an increase in the subscriber base, growth in internet traffic, and expansion of mobile and fixed network coverage.

Tajikistan’s Parliament approves organized recruitment of migrants to Russia

The paperwork will be transferred to the home country, and employers will select employees in advance.

Creativity as an asset: why marketing in Central Asia is reaching a new level

Business expert in international projects for the support and development of media companies, Svetlana Lebedeva, on marketing and the media market.

European Immunization Week starts in Tajikistan

Information and awareness-raising activities are being conducted across the country to increase trust in vaccination and combat misinformation.

The plan to launch the CASA-1000 project in 2027 discussed in Dushanbe

The Ministry of Energy of Tajikistan, Afghan DABS, and other project participants held a series of meetings.