Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Avalanches block Dushanbe-Khujand highway again - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Avalanches block Dushanbe-Khujand highway again

10
10

Heavy snowfall on February 20 caused a series of snow-slides that blocked in several places the highway connecting Dushanbe and the northern city of Khujand.

More than 10 avalanches occurred in the Varzob district yesterday blocking the Dushanbe-Khujand highway in several places,” says the press center of the Branch of the Innovative Roads Solutions (IRS) Company in Tajikistan, which operates the toll on the Dushanbe-Khujand-Chanak highway.   

Snowfall is going on and the risk of further avalanches reportedly remains high.

Meanwhile the Emergencies Committee says the highway connecting Dushanbe and Khorog, the capital of the Gorno-Badakhshan Autonomous Region (GBAO) remains closed to traffic.

“Avalanches yesterday blocked in several places roads leading from Khorog to Ishkashim and Murgab districts,” Umeda Yusufi, a spokeswoman for the Emergencies Committee, told Asia-Plus today morning. 

Recall, at least eight people were killed in snow avalanches in Tajikistan last month.  More than 110 snow-slides were registered in the country in January.   

Mountains cover 93 percent of Tajikistan, and avalanches and mudslides kill dozens of people every year.  

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS