Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Khorog in snow captivity - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Khorog in snow captivity

5
5

KHOROG, February 8, Asia-Plus  — Following ongoing heavy snowfalls, the situation in Gorno Badakhshan remains complex and its administrative center, the city of Khorog, is still in snow captivity.

The GBAO emergencies official Yusuf Qurbonov told Asia-Plus today that serious snow blockade occurred practically on all roads from Khorog.  “All highways from Khorog, except the Khorog-Ishkashim road, are closed for traffic,” Qurbonov said, noting that a series of avalanches caused by heavy snowfalls blocked in some places the roads from Khorog to Murgab district and Dushanbe.

“Many vehicles were trapped after avalanches hit the areas near the villages of Qalot and Past Khouf in the Rushan district,” the GABO emergencies official noted.

In the meantime, work on clearing roads of snow is going on.  Khoushnazar Abdurahimov, deputy head of the state unitary enterprise Badakhshonroh (GBAO state transportation enterprise), says, “Heavy snowfall is continuing for already three days that makes work on clearing roads of snow dangerous because the avalanche risk is high.” 

Some one meter of snow has fallen in some areas of the region over the past weekends, severing communications between the districts in Gorno Badakhshan.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS