Tajikistan’s president opens repaired road sections and new flight maintenance complex at KIA

On November 20, a ceremony was held in the Sughd province to inaugurate three newly renovated sections of the Dehmoy – Konibodom road: 1) Dehmoy in Jabbor-Rasoulov district – Bobojon-Ghafourov town; 2) Bobjon-Ghafourov town – Khistevarz; and 3) Kuchkak – Konibodom. The event was attended by Tajik President Emomali Rahmon. According to the Tajik president's […]

Asia-Plus

On November 20, a ceremony was held in the Sughd province to inaugurate three newly renovated sections of the Dehmoy – Konibodom road: 1) Dehmoy in Jabbor-Rasoulov district – Bobojon-Ghafourov town; 2) Bobjon-Ghafourov town – Khistevarz; and 3) Kuchkak – Konibodom. The event was attended by Tajik President Emomali Rahmon.

According to the Tajik president's official website, the renovated road sections, totaling 52 kilometers in length, were reconstructed as part of the "Improving Regional Transport Connectivity in Central Asia" program. The project, which covers the Sughd and Khatlon provinces, as well as the Gorno-Badakhshan Autonomous Region (GBAO), has a budget of $56 million.

During the construction of the Dehmoy – Konibodom road, 11 road bridges, 17 bus stops, reinforced concrete retaining walls, power and communication lines, pedestrian walkways, and protective barriers were built.

Plans also include the construction of a fourth section of the road, from Kurush to Bekobod, stretching 12.7 kilometers, at a cost of over $8 million. Additionally, a 9.7-kilometer stretch of the Khistevarz – Sohilob road is being upgraded, with an investment of $4.5 million.

On the same day, President Emomali Rahmon inaugurated a new flight maintenance complex at the Khujand International Airport (KIA).

The new building, covering an area of 936 square meters, was constructed to support aircraft maintenance operations. The previous building, constructed in the 1950s and 1960s, had become outdated and no longer met modern standards.

The new complex consists of three floors. The ground floor houses a garage for 20 vehicles, and the building includes 32 service rooms and three classrooms. Additionally, a separate technical garage building, measuring 864 square meters, has been constructed next to the complex.

Join us on social media!

Article translations:

Related Article

Tenisi
Оби зулол
Оби зулол

Most Read

Коммерсбонк Точикистон

Recent Articles

Drought in Central Asia becoming a chronic threat, IWMI expert warns

The temperature in the region is rising faster than the global average.

Emomali Rahmon congratulates Tajikistanis on Eid al-Adha and calls for thrift

The President reminded that Idi Qurbon is not a wedding but a religious ceremony that should take place without ostentatious luxury.

Gazpromneft – Tajikistan launches the “Welcome Skidka” program for corporate customers

New clients - legal entities and individual entrepreneurs - can take advantage of special conditions until the end of the current year.

In Dushanbe, 28 sellers fined for unjustified price increases

On the eve of Idi Qurbon, inspections are being conducted at the capital's retail outlets.