Presentation of the Dushanbe-Qurghon Teppa Road Project given in Dushanbe

DUSHANBE, May 26, 2016, Asia-Plus – Presentation of the Dushanbe-Qurghon Teppa Road Project was given in Dushanbe on May 24, according to the Ministry of Transport (MoT). The presentation was reportedly given by representatives of Kocks Consult GmbH (Malta). Tajik Transport Minister Sherali Ganjalzoda ordered relevant officials at a MoT to pay a special attention […]

Asia-Plus

DUSHANBE, May 26, 2016, Asia-Plus – Presentation of the Dushanbe-Qurghon Teppa Road Project was given in Dushanbe on May 24, according to the Ministry of Transport (MoT).

The presentation was reportedly given by representatives of Kocks Consult GmbH (Malta).

Tajik Transport Minister Sherali Ganjalzoda ordered relevant officials at a MoT to pay a special attention to the project’s technical parameters in order to avoid problems during the implementation of the project.

The estimated budget for implementation of this project is about 250 million U.S. dollars.

The Asian Development Bank (ADB) notes that the proposed project will improve Central Asia Regional Economic Cooperation (CAREC) corridors 2, 5 and 6 by improving a section of the 90-kilometer road section from Dushanbe to Qurghon Teppa, the capital of Khatlon province. The project will also improve road safety through provision of funding for safe urban areas, strengthen road asset management through the provision of a road asset management system for the Ministry of Transport, and provide technical assistance relating to the development of logistics centers.

The Government of Tajikistan has reportedly requested project preparatory technical assistance (PPTA) from the ADB to identify, formulate and prepare a loan and/or grant for a 20-kilomter section of the 90-kilometer long Dushanbe to Qurghon Teppa road.  The PPTA assesses the technical, economic, financial, social, and environmental viability of the project and prepare required due diligence documents.

The main outcome of the PPTA is a feasibility study covering the entire corridor between Dushanbe and Qurghon Teppa.  

Article translations:

Related Articles

Оби зулол

Most Read

Join us on social media!

Aura

Recent Articles

Emomali Rahmon: “Mountain ecosystems of Tajikistan play a key role in the sustainable development of the region”

The President of the Republic of Tatarstan spoke at the Regional Environmental Summit taking place in Astana.

Tajikistan’s economy grew by 8% in the first quarter of 2026

The main drivers remain agriculture, industry, and construction.

Tajikistan to be represented by ten athletes at the 2026 Asian Beach Games

The games will take place from April 22 to 30 in the Chinese resort city of Sanya.

Protection of depositors’ interests is our concern, – Deposit and Savings Insurance Fund of Tajikistan

The main task of the Fund is to protect the interests of depositors and strengthen public confidence in the country's banking system.

Ambassador of China: China remains the main investor in Tajikistan

Interview with the Ambassador of China to Tajikistan, Mr. Guo Zhijun.

A23a is done: the legendary giant iceberg has almost disappeared, losing 99% of its area

The giant is "ending the story," rapidly disintegrating in open waters.

Budget travel and service issues: how to make traveling in Tajikistan affordable for Tajik citizens?

The State Committee for Tourism explained why domestic tourism in Tajikistan is more than just an alternative to trips abroad.

Tajikistan’s potato imports from Kazakhstan increase 257 times

The surge is linked to the lifting of the temporary export ban to Kazakhstan.