Only two actors to remain in CASA 1000 project

Practically nothing has been done in three years ahead of completion of the Central Asia South Asia Electricity Transmission and Trade (CASA-1000) Project while some participants in the project have practically already dropped out of it…  Actually, the project has narrowed to supply of Tajikistan’s electricity to Pakistan. The project was discussed at a quadrilateral […]

Asia-Plus

Practically nothing has been done in three years ahead of completion of the Central Asia South Asia Electricity Transmission and Trade (CASA-1000) Project while some participants in the project have practically already dropped out of it…  Actually, the project has narrowed to supply of Tajikistan’s electricity to Pakistan.

The project was discussed at a quadrilateral summit of CASA-1000 member nations in Tajikistan on July 6.

Recall, Tajik leader has called on nations participating in CASA-1000 project to speed up the process of the implementation of the project.

In a statement delivered at the quadrilateral summit of CASA-1000 member nations, Emomali Rahmon, particular, noted that because of the delay in the implementation of the project, the participating countries annually lose more than 500 million USD in total.   He proposed holding regular meetings of the competent officials of the project participating countries.  Tajik leader also proposed considering the possibility of holding annual high-level meetings of the project participating countries.

The CASA-1000 project aims at developing energy corridor and land connectivity between Tajikistan, Afghanistan and Pakistan.

The Central Asia South Asia Electricity Transmission and Trade (CASA-1000) Project demonstrates landmark cooperation among Kyrgyzstan, Tajikistan, Pakistan, and Afghanistan. The modern and efficient CASA-1000 electricity transmission system will help transform the region and signify an important step toward realizing the planned Central Asia-South Asia Regional Electricity Market (CASAREM). The CASAREM initiative will help not only these four countries, but also improve the electricity systems and develop inter-regional cooperation between Central Asia and South Asia.

The CASA 1000 project is scheduled to be completed in 2020. The total cost of the project amounts to 1.7 billion U.S. dollars.

The Project is expected to develop the necessary physical infrastructure and create the institutional and legal framework to transmit surplus power available from existing generation facilities in Tajikistan and Kyrgyzstan to Afghanistan and Pakistan.  The physical infrastructure for CASA 1000 includes: a 500 kV high voltage direct current (HVDC) transmission system between Tajikistan and Pakistan through Afghanistan; an AC transmission link from Kyrgyzstan and Tajikistan to connect to the HVDC line from Tajikistan to South Asia; and the necessary electricity sub-stations in Kabul, Peshawar and Sangtuda (in Tajikistan).

Article translations:

Related Articles

Оби зулол

Most Read

Join us on social media!

Recent Articles

Hajj 2026: New Rules and Restrictions Introduced in Saudi Arabia

Entry to Mecca is now only possible with a special permit.

Emomali Rahmon flies to Astana for the Regional Ecological Summit

President of Tajikistan Emomali Rahmon departed today for a...

Nexign and TelecomDaily: the telecommunications market in Tajikistan grew by 13.7% in 2025

A study showed that the country's communications market has grown to 4.9 billion somoni, and the dynamics are influenced by an increase in the subscriber base, growth in internet traffic, and expansion of mobile and fixed network coverage.

Tajikistan’s Parliament approves organized recruitment of migrants to Russia

The paperwork will be transferred to the home country, and employers will select employees in advance.

Creativity as an asset: why marketing in Central Asia is reaching a new level

Business expert in international projects for the support and development of media companies, Svetlana Lebedeva, on marketing and the media market.

European Immunization Week starts in Tajikistan

Information and awareness-raising activities are being conducted across the country to increase trust in vaccination and combat misinformation.

The plan to launch the CASA-1000 project in 2027 discussed in Dushanbe

The Ministry of Energy of Tajikistan, Afghan DABS, and other project participants held a series of meetings.