Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/asiaplus/wp-includes/functions.php on line 6121
Uzbekistan starts construction of objects of external power supply - Asia-Plus | News from Tajikistan, Central Asia and the World

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Дорогие читатели!

Мы проводим тестирование нового сайта. Сейчас доступны только свежие материалы за сегодня. Чтобы прочитать архивные материалы, воспользуйтесь кнопкой «Старый сайт».

Старый сайт

Uzbekistan starts construction of objects of external power supply

8
8

Construction of objects of external power supply of Tashkent city started in frames of joint project of “Uzbekenergo” and Eximbank (China) in Uzbekistan, Uzbek company”s press service reported.

Transmission station “Keles” with high voltage line 220 kW, transmission station 110 kW “Navoi,” and 110 kW “Saiilgoh” station will be built in the course of the project, source reported.

“For this day “Uzbekenergo” company has concluded a contract on supply of electric equipment and materials with a cost of about US $27.750 million with Chinese company Xian Electric Engineer Co. Ltd. Financing of the project with a maximum value of US $59 million will be realized from own means of “Uzbekenergo” – more than US $32 million, and credit means of Chinese Eximbank in the value of more than US $26 million. Credit will be provided for 20 years term, including grace period of 5 years, with 2% interest rate per year,” source concluded.

Translations:

Related articles

spot_imgspot_img

Join us on social media!

Новости компаний

Новости компаний

Company News

Asian Express Company resumes bus services connecting Tajik capital to northern part of Tajikistan

Asian Express Company has reportedly resumed bus services connecting...

Tajik private airline signs MoU with Saudi air travel company to develop Dushanbe-Jeddah service

Tajikistan’s privately owned air company Somon Air and Saudi...

Tajik state-run insurance company’s operating license extended for the next five years

The National Bank of Tajikistan (NBT) has extended the...

“Dead souls” found in Tajikistan’s electric power system

The Open Joint-Stock Company (OJSC) Power Distribution Networks has...
spot_imgspot_img

LATEST NEWS